Tamarac, FL · Broward County
Engineering Permit Application
Required for any work touching Tamarac rights-of-way — driveway aprons, utility cuts, sidewalks, paving, swale work.
What this form is
The Tamarac Engineering Permit Application is required when the scope of your project impacts public rights-of-way, roadways, or swales. Common triggers include new driveway aprons, utility cuts (fiber, water, sewer), paving repairs, and stormwater work. The owner's authorization is notarized for the same reason as the building permit — to confirm permit authority over the property.
Who needs it
Tamarac homeowners installing new driveways, utility lines crossing public ROW, or any contractor doing road/sidewalk work.
Why it needs a notary
City of Tamarac Engineering Department requires a notarized owner's signature before issuing the ROW permit.
Preview the form
The blank PDF straight from Tamarac. Look it over, then upload your filled copy to start the notary session.
You’ll need ID and a webcam.
A licensed Florida online notary will join you on video, verify your government-issued ID, witness your signature, and apply their seal. You’ll receive the notarized PDF by email when the session ends.